Also known as: Contractor’s All Risk Policy
Comprehensive cover for civil construction projects, from site preparation through to handover.
Contractor’s All Risk covers physical loss or damage to civil engineering and construction works during the project period, together with third-party liability arising from construction activity. It is an all-risk policy, meaning it covers all causes of loss except those specifically excluded. Most construction contracts in India require it as a condition of commencement, and project owners frequently specify minimum limits.
Civil contractors, infrastructure developers, real estate developers and project owners. Typically arranged by the principal contractor but frequently specified and sometimes placed by the project owner. Sub-contractors are usually covered as additional insureds under the main policy, though this should be confirmed rather than assumed.
Sum insured is the full contract value including materials, labour and any free-issue materials supplied by the principal. Third-party limits are set separately and commonly specified in the contract. Under-declaring contract value triggers the average clause and reduces every claim proportionally.
The difference between a policy that responds and one that disappoints usually sits in details that are easy to overlook at purchase.
Not sure which combination fits your business?
Speak to an AdviserEither. The contract determines it. Owner-arranged policies covering all contractors are common on larger projects and avoid coverage gaps between parties.
Cover must be extended. Damage during an unextended overrun period falls entirely outside the policy. This is one of the most common gaps in construction insurance.
The defective work itself is excluded. Damage caused to other parts of the works by that defect is generally covered, depending on the wording and which exclusion clause applies.
Cover during the defects liability period after handover, when the contractor remains contractually responsible for rectifying defects. Without it, that period is uninsured.
No. Cranes, excavators and site plant require a separate Contractor’s Plant and Machinery policy.
Almost invariably. Public infrastructure tenders specify CAR cover with defined minimum limits as a qualification condition.